Troop 899 on Duty at Spence Ridge

posted in: Trail Work | 0

Troop 899 completed their quarterly trail maintenance on the Spence Ridge Trail today.  Most of the work was cleaning out the drains — a critical element in this wide trail that collects a lot of rain that can quickly wash away the trailbed pulverized by the heavy traffic in the summer.  There was also deadfall and trash to deal with.  Great job 899!

 

 

 

 

 

 

 

(Photos: Lee Kearson)